Fish River customers
If the Fish River pipeline crosses your property, you are eligible to connect to the pipeline for a supply of water.
Report a hazard - phone: 1800 061 069
WaterNSW head office
1PSQ, Level 14, 169 Macquarie Street Parramatta, NSW 2150
Contact us:
P: 1300 662 077
E: enquiries@waternsw.com.au
Postal address
WaterNSW
PO Box 398, Parramatta, NSW 2124
Warragamba Dam visitor centre
P: 02 4774 4433
Need an interpreter?
需要口譯員嗎?
Cần một thông dịch viên?
Necesitas un intérprete?
Hai bisogno di un interprete?
The valve replacement work on the Oberon Dam Intake Tower is complete. The work ensures the reliable and efficient operation of the Oberon Dam Intake Tower and safe water supply to customers in the Fish River region. Work started on 5 August and was completed on 13 September 2024.
It’s important to note that some of the pipes only carry raw (untreated) water which is not suitable for human consumption. For our contractual terms, please refer below or contact the WaterNSW Customer Service Centre to organise to connect or disconnect from the pipeline.
Download the document below to find out more about the Agreement for the Supply of Raw Water for the Fish River Water Supply Scheme:
Download the document below to find out more about the Agreement for the Supply of Filtered Water for the Fish River Water Supply Scheme:
You can view current water pricing for the Fish River Valley.
WaterNSW has introduced fluoride dosing to Stage 1 (filtered) water in line with current Australian Drinking Water Guidelines (ADWG). This is part of our standard operating procedure and will enhance the quality of the drinking water provided to our customers.
For further information about fluoridation, please visit the NSW Health website.
If you have any questions, please contact our Customer Service Centre.
Download the map below to find the location of the Fish River Pipeline:
It is important that you update us when your contact details change as it allows us to contact you or your tenant as quickly as possible. Please confirm and update your phone number and email address.
If you are not living at the property, please assist us by providing your tenants' phone number so we are able to alert them of water quality or supply issues.
The Fish River water supply scheme on the NSW Central Tablelands is unique as the only water supply scheme in eastern Australia to transfer western flowing water east of the Great Dividing Range, mostly by gravity.
Started by the Civil Constructional Corps during WWII and expanded in the 1950s and 1960s, the scheme draws water from Oberon Dam and Duckmaloi Weir and includes 236 kilometres of pipelines and a tunnel under the Great Dividing Range.
Today the scheme provides water to Wallerawang and Mount Piper power stations, to Oberon and Lithgow councils for domestic and industry use, and to about 230 properties along its route. It also supplements town supplies in the upper Blue Mountains.
The Fish River water supply scheme has its origins in chronic water supply problems in the towns of Lithgow, Wallerawang, Portland and Oberon, which were exacerbated by the 1940s drought. Small local schemes were rejected in favour of a regional scheme but funding shortages delayed the start of work.
World War II and the need for Australian-sourced fuel secured Commonwealth Government funding to re-start the project in 1943 with an expanded scope to include water supply to the Glen Davis shale oil works. Initial construction was by the Civil Constructional Corps, established in 1942 to supply labour for wartime infrastructure projects such as airfields, roads and barracks.
The early 1950s saw the closure of the shale oil works but the creation of new power stations for electricity generation at Wallerawang. The power stations’ need for cooling water, and increasing domestic demand in the upper Blue Mountains where there were frequent water restrictions, was the catalyst for the scheme’s expansion in the 1950s and 1960s.
Today the scheme supplies water to Wallerawang and Mount Piper power stations, to Oberon and Lithgow councils for domestic and industry use, and to about 230 properties along its length. It also supplements town supplies in the upper Blue Mountains.
Work on the Fish River water supply scheme began in 1943 by the Civil Constructional Corps. The corps comprised mainly men aged in their 30s and 40s who were too old to serve in the armed forces but who were conscripted to build wartime infrastructure. They received pay based on civilian award rates but their work was highly regulated; they could not strike and might be sent anywhere in Australia.
Oberon Dam’s slab and buttress design was adopted partly because of the availability of this relatively cheap labour, and also due to the wartime shortage of earthmoving equipment need to build an earth-fill embankment dam. Oberon became the first slab and buttress dam in NSW, and when raised to its maximum design height of 33.5 metres in 1957, it became the largest such dam in Australia.
Five construction camps were established at Oberon Dam, Duckmaloi, Tarana, Wallerawang and Coco Creek near Glen Davis. Each camp had 150-280 men and was organised on a similar layout to military camps with prefabricated buildings, generally semi-cylindrical Nissen Huts, including a kitchen/mess, welfare/canteen, medical/administration, ablutions, drying room and barrack-style accommodation blocks.
The Oberon Dam work site also included a railway siding, concrete batching plant with flying fox and workshops for blacksmiths, plumbers, riggers, machinists and carpenters.
Workers endured winter temperatures as low as minus eight degrees Celsius. Most of the excavation for the 105-kilometre pipeline from Oberon to Glen Davis was done by hand because the terrain was so steep and rugged.
Following the disbandment of the Civil Constructional Corps in 1945, many ex-members remained working on the Fish River scheme as contract labourers. Oberon Dam was largely completed by 1947 but finishing work on stage 1 continued until 1949 when the last houses in Glen Davis were connected.
The campsites were dismantled and moved to other locations when work was completed. Only one of the Nissen Huts remains at Oberon Dam, just behind the dam wall.
Work on stage two began in 1954. The Oberon Dam wall and outlet tower was raised to its current height of 33.5 metres, and a new ski jump spillway added.
Much of the equipment used on stage 1 was still on site and was re-used. A construction camp of 50 pre-fabricated cottages and living quarters for 100 single men was established nearby.
The original design was for slab and buttress construction across the entire length of raised wall. A cheaper earth-fill embankment was instead built on the left abutment thanks to the now ready availability of earthmoving equipment after the war. The raised dam was completed in 1957.
Stage 2 of the scheme’s expansion also included construction of a new 54-kilometre long pipeline from Oberon to Wallerawang to service the new power station. Pipeline construction began in 1957 and finished in 1959.
The contract was so large that a special pipe manufacturing plant was built at Lithgow. There 10,000 pipes were built for what became the longest pre-stressed concrete water supply pipeline in Australia.
Work on stage 3 began in 1961. It involved extending the Fish River scheme to communities in the upper Blue Mountains.
In a major change to the original concept, a tunnel was built under the Great Dividing Range at Hampton so that water could be supplied by gravity from Oberon to Katoomba via a 40-kilometre long steel pipeline connecting the Fish River scheme to the Cascade Dams.
The 2.1 metre high by 1.2 metre wide Hampton tunnel was excavated using the drill and blast method. Its 1.1-kilometre length is 44 metres under the surface at the range’s highest point.
The steel pipeline is notable for the pressure it withstands during a 250-metre climb from the Megalong Valley to Narrow Neck Peninsular, a section which includes a 30-metre vertical pipe attached to the rock face.
WaterNSW acknowledges the traditional custodians of the lands and waters on which we work and pay our respects to all elders past, present and emerging. Learn more